Tyson Creek 10
Slope below tunnel entrance. Waste rock from the tunnel drilling operation have been deposited in a small clear-cut that was logged about ten years ago. In industry parlance, this is a spoilage site. According to Renewable Power this material has been tested and does not produce acid rock drainage.

Next slide
- Last Updated: Tuesday, 15 December 2009 09:51